On May 18th, the Capacity Upgrade Project of an Iron and Steel Company blast furnace was successfully ignited. The project entered the stage of full-line production, opening a new chapter in the optimization of the layout, transformation and upgrading of the iron and steel industry in Henan Province.

JUREN made several capacity 300t overhead cranes for its steel foundry plant. These cranes are with four-girder four-track structure, which is for the task of foundry process transfer, converter charging, refining and molten steel receiving.

The overall annealing and overall processing of the main hoisting frame ensure the installation accuracy of gears, bearings, motors, brakes, etc., with low noise, smoothness and no impact; the overall processing of the bridge frame ensures product wheel line accuracy and more stable operation.

Tags300T Overhead Crane for Steel Foundry Plant
Previous: No moreNext: 40.5t Gantry Crane for Railway Container Handling

Related Products

Applications

Information Request

Fill in your requirements to find out what we can do for you next project.

Include a self introduction and special requests(if any) for better quotations.